75mm is the maximum clear cover of concrete
it is the clear cover for stirrups. effective cover of the reinforcement = nominal cover+ diameter of stirrups+half diameter of main bars
The maximum thickness of a reinforced concrete wall is 203 mm.
minimum curing period of concrete is 21 days and maximum is 28 days
POUR THE CONCRETE OVER THE BRICK
For River Sand Not more than 8%
There are several reasons, but corrosion protection and concrete spauling are probably the most important factors.
it is the clear cover for stirrups. effective cover of the reinforcement = nominal cover+ diameter of stirrups+half diameter of main bars
The maximum thickness of a reinforced concrete wall is 203 mm.
minimum curing period of concrete is 21 days and maximum is 28 days
POUR THE CONCRETE OVER THE BRICK
The clear cover is the concrete from outer face of stirrups to outer face of concrete. cover is provided to safe guard reinforcement from various environmental agents like moisture, harmful chemicals like sulphates and chlorides , carbonation due to atmospheric CO2 and moisture, chemical gases , near sea, sea water spray etc. Thickness of cover depends on the importance of structure, exposure conditions, fire rating required.- Satyanarayana, Hyderabaad,India
For proper curing
45degree maximum
unsitable cover for concrete reinforcement
HOW LARGE IS THE CONCRETE POND?
Required slump for pump concrete is 100 -200 mm is suitable with used of admixture
The clear cover value for the RC water tank is approximately $50.