100
To find out how many 94-pound bags of Portland cement are needed for a yard of sand, you typically use a 1:2:3 mix ratio (cement, sand, gravel) for concrete. Since a yard of sand weighs about 1,600 pounds, you'll need approximately 533 pounds of cement for that mix. Given that each bag of Portland cement weighs 94 pounds, you would need about 6 bags (533 ÷ 94 ≈ 5.67). Therefore, you would need 6 bags of Portland cement for a yard of sand.
You will need about a bag of cement for this project. You will also need around 0.15 cu.m of sand.
There are 27 cubic feet in a cubic yard, and a 60-pound bag of cement typically yields about 0.45 cubic feet when mixed. To fill one cubic yard, you would need approximately 60 bags of 60-pound cement.
It depends on the usage of the concrete. For footings, you would need 5 bags of cement. For sidewalks, etc. you would need 6 bags. Generally, if you know the usage it's for, you can contact a local ready-mix plant and they can tell you exactly.
Need to know how many bags of cement I will need for a 20x10 space?
Bags of what? Grass seeds? Cement? Sugar?
To calculate the amount of cement and sand needed for plastering 270 square meters, you can use a typical mix ratio, such as 1 part cement to 4 parts sand. Assuming a plaster thickness of about 12 mm, you would need approximately 1.5 cubic meters of plaster. This translates to roughly 300 kg of cement (about 6 bags of 50 kg each) and about 1.2 cubic meters of sand. Always consult a local expert for precise calculations based on specific conditions and mix ratios.
How many bags of cement am I going to need, for a screed floor finish in 5.4m³?
To find out how many 94-pound bags of Portland cement are needed for a yard of sand, you typically use a 1:2:3 mix ratio (cement, sand, gravel) for concrete. Since a yard of sand weighs about 1,600 pounds, you'll need approximately 533 pounds of cement for that mix. Given that each bag of Portland cement weighs 94 pounds, you would need about 6 bags (533 ÷ 94 ≈ 5.67). Therefore, you would need 6 bags of Portland cement for a yard of sand.
If a 20kg bag of cement=0.1m3 with 100 lots o 0.01 to 1m3 then you will need 12.5 bags per m3. So you need approx 11.5m3 of sand and 144 bags of cement (144 x 0.01 = 1.44m3) to give you a total of 12.94m3
You will need about a bag of cement for this project. You will also need around 0.15 cu.m of sand.
It depends on the units of your measurements in. You also need to know the weight of a bag of cement. The instructions on the bag of cement should also help.
There are 27 cubic feet in a cubic yard, and a 60-pound bag of cement typically yields about 0.45 cubic feet when mixed. To fill one cubic yard, you would need approximately 60 bags of 60-pound cement.
It depends on the usage of the concrete. For footings, you would need 5 bags of cement. For sidewalks, etc. you would need 6 bags. Generally, if you know the usage it's for, you can contact a local ready-mix plant and they can tell you exactly.
6 x 4.32 = 25.92 so you will need 26 bags. You might want to get up to 10 % extra for waste.
To determine the number of 50kg cement bags required for 15 ratio mortar joints in a masonry wall with a volume of 10m³, we first need to know the mortar mix ratio and how much mortar is needed. Assuming a common mortar mix ratio of 1:4 (cement:sand), for 10m³ of masonry, you might need around 1.5m³ of mortar. If the density of cement is approximately 1440 kg/m³, you would need about 2160 kg of cement, which translates to 43 bags of 50kg cement (2160 ÷ 50 = 43.2). Therefore, you would requisition 44 bags of cement.
Need to know how many bags of cement I will need for a 20x10 space?