One cubic metre of concrete weighs 2.5 Tonnes.

Typically, 1m3 of concrete is made up of 350Kg of cement, 700Kg of sand, 1,200Kg of chippings and 150 Litres of water.

User Avatar

Wiki User

13y ago

What else can I help you with?

Related Questions

How much sand and aggregate required 1 cubic meter of plain concrete cement?

For plain cement concrete, the aggregate used is of size 20 mm. For RCC structures, it is 40mm and for roads, it is 80mm


How much sand and aggregate required 1 cubic meter of M30 grade cement?

Type your answer here... 11.2


How much sand and aggregate required 1 cubic meter of m10 grade cement?

For M20 grade concrete mix proportion=1:1.5:3 And dry volume factor is 54 percent. Hence, we required to find quantities for 1.54 cum concrete. cement required=(1/5.5) x (1.54)=0.27 cum, Sand required=(1.5/5.5) x (1.54)=4.2 cum, Stone chips required=(3/5.5) x (1.54)=0.84 cum.


How much reinforcement steel required in 1 m3 concrete of M50 Grade?

i dn k=12*45


How much cost the aggregate that used for mixing one ton of asphaltic concrete?

First find out how much concrete is needed for your project thwn do the calculations.


How much cement required 1 cubic meter m10 grade concrete?

To calculate the amount of cement required for 1 cubic meter of M10 grade concrete, which has a mix ratio of 1:3:6 (Cement: Sand: Aggregate), you can use the following formula. The total parts of the mix are 1 + 3 + 6 = 10 parts. For 1 cubic meter, the volume of cement required is approximately 1/10 of the total volume, which is about 0.1 cubic meters. Given that the density of cement is around 1440 kg/m³, you would need approximately 144 kg of cement for 1 cubic meter of M10 concrete.


How much of aggregate do you need to make concrete?

To make concrete, the typical aggregate content is about 60-75% of the total volume, which includes both coarse aggregate (gravel or crushed stone) and fine aggregate (sand). The exact amount can vary based on the specific mix design and the desired properties of the concrete. Generally, a common ratio for a standard concrete mix is 1 part cement, 2 parts sand, and 3 parts coarse aggregate by volume. Always consult specific mix guidelines for your project's requirements.


How much sand and aggregate required 1 cubic meter concrete?

To produce 1 cubic meter of concrete, the typical mix design requires approximately 1.5 to 2 cubic meters of sand and aggregate combined, depending on the specific mix ratio. A common mix ratio is 1 part cement, 2 parts sand, and 3 parts aggregate, which translates to about 0.5 cubic meters of sand and 0.75 cubic meters of aggregate. However, the exact quantities can vary based on the desired strength and application of the concrete. Always refer to a specific mix design for precise measurements.


How much is a yard of concrete currently?

How much concrete is required to fill 100 cu feet


How much aggregate cement sand is required to make 1 cube concrete?

To make 1 cubic meter of concrete, the typical mix ratio for a standard concrete is about 1 part cement, 2 parts sand, and 3 parts aggregate (1:2:3). This means you would need approximately 350 kg of cement, 700 kg of sand, and 1050 kg of aggregate. The total volume for these materials should add up to 1 cubic meter when factoring in the mixing process and compaction. Adjustments can be made based on specific project requirements or desired concrete strength.


How much aggregate are used in 1bag of cement?

Approximately 5bags of cement are in 1 cu.m concrete ratio 1:3:6 with 20mm aggregate, water-cement ratio 0.5.


How much pressure need for injection grouting in concrete?

It depends upon the form configuration,aggregate voids and grout fluidity.