For M20 grade concrete mix proportion=1:1.5:3

And dry volume factor is 54 percent.

Hence, we required to find quantities for 1.54 cum concrete.

cement required=(1/5.5) x (1.54)=0.27 cum,

Sand required=(1.5/5.5) x (1.54)=4.2 cum,

Stone chips required=(3/5.5) x (1.54)=0.84 cum.

User Avatar

Wiki User

13y ago

What else can I help you with?

Related Questions

How much sand and aggregate required 1 cubic meter of M30 grade cement?

Type your answer here... 11.2


How many 50kg cement bags is in 1 Cubic meter grade 30 concrete?

To determine how many 50 kg cement bags are required for 1 cubic meter of Grade 30 concrete, we need to break down the mix ratio and calculate the cement content based on that. Grade 30 Concrete Mix Ratio Grade 30 concrete typically has a mix ratio of 1:2:3 (Cement: Sand: Aggregate) by volume. This means: 1 part cement 2 parts sand 3 parts aggregate (gravel) However, the actual proportion of cement required can vary slightly depending on the specific mix design used by a contractor or engineer. For standard Grade 30 concrete, the cement content is typically around 350 to 400 kg per cubic meter. Since each cement bag weighs 50 kg, the number of bags required for 1 cubic meter of Grade 30 concrete would be: Number of bags = 350 kg / 50 kg   = 7 bags


What is number of bags of cement required foe 1 cubic meter of M20 grade cement concrete?

M20 - 6.20bags


What is the kilogram weight of cement required for 1 cubic meter of M20 grade cement?

315 Kg/M3 approx.


What is the number of bags of cement required for 1 cubic meter of M15 grade cement concrete?

M 15 grade proportion - 1:2:4 (cement:FA:CA)Cement required in kgs - 325 kg per cu.mNo. of bags required - 6.50


What is the number of bags of cement required for 1 cubic meter of M25 grade cement?

For M25 grade concrete, the mix proportion is typically 1:1:2 (cement:sand:aggregate). This means for 1 cubic meter of concrete, you would need 1/4 cubic meter of cement. As 1 cubic meter is equivalent to 35.32 cubic feet, and one bag of cement usually covers around 0.035 cubic meters, you would need approximately 7-8 bags of cement for 1 cubic meter of M25 grade concrete.


How much sand and aggregate required for m25 grade concrete?

One cubic metre of concrete weighs 2.5 Tonnes. Typically, 1m3 of concrete is made up of 350Kg of cement, 700Kg of sand, 1,200Kg of chippings and 150 Litres of water.


1 cubic feet of concrete requires how much coarse aggregate and fine aggregate?

it should depend in which construction you going to be used the concrete....means it is used in a house or in a big project like a massive dam...........like the ratio of "C:S:A "C= CEMENT S= SAND(FINE AGREEGATE) A=AGREEGATE (COARSE AGG)IN SOME TIME IT USED AS THE RATIO OF 1:2:4OR 1:1.5:3 AND RATIO IS USED TO FIND THE QUANTITY OF SAD AND AGREEGATE...............1 cubic feet of concrete requires how much coarse aggregate and fine aggregate?ANSWER :Grade is M20 and ratio for M 20 is 1:1.5:3void ratio for cement is 100 % compressivevoid ratio for fine aggregate 20 %void ratio for coarse aggregate 32% , from IS codeNOTE : (that means cement have compressive in 100%fine Aggregate needs compressive in 20 %coarse Aggregate needs compressive 10 32 % , from IS code )total ratio for mix is 1.52cement = 1fine aggregate = 1.5coarse aggregate = 3total is 1 + 1.5 + 3 = 5.5take now all dimension meter only , convert it in feet with end of the solutionCEMENT = [(1 X 1 X 1.52 X) / 5.5 ]= 0.28 m³1 is required quantityAnother 1 is cement ratio1.52 is total compressive for concreteTotal ratio is 5.550 Kg per bag of cement is 0.0347 m³No of bags required for 1 m³ of concrete is.28 m³ / .0347 m³ = 8.07 bags take 8 bagsCEMENT = 9.88 cubic feetFINE AGGREGATE = [ ( 1 X 1.5 X 1.52 ) / 5.5 ) = 0.41 m³Here 1.5 is fine aggregate ratio , remaining is same as above.1 m³ = 35.29 cubic feet1 cubic feet = .03 m³F.AGG = 14.47 cubic feetCOARSE AGGREGATE = [ ( 1 X 3 X 1.52 ) / 5.5 ) = 0.83 m³Here 3 is ratio of coarse aggregateC. AGGREGATE = 29.29 cubic feetANS :CEMENT = 9.88 cubic feetF.AGG = 14.47 cubic feetC. AGGREGATE = 29.29 cubic feetNote : [ 100 cubic feet is 1 brass1 m³ = 35.29 f³1 f3 = 1 m³ / 35.29 = 0.03 m³


Cement required for m20?

M20 grade - 1:1.5:3Cement required - 360 kgs per m3Cement required - 7.2 bags.


How many bags cement to make 1 cubic meter of M15 grade cement concrete?

15 milligrams


What is cement consumption of cement in CONCRETE 124?

M 15 grade - 1:2:4Cement bags required - 6.5 bagsCement required - 325 kgs


What is the bulk density of cement?

The bulk density of cement typically ranges from 1.1 to 1.4 grams per cubic centimeter, depending on the type and grade of cement used.