answersLogoWhite

0

You could add lime putty. But the best solution would be to get a cement that sets in the amount of time you need, a 'slow setting cement'.

User Avatar

Wiki User

16y ago

What else can I help you with?

Related Questions

What is the best method for creating the strongest concrete mix for a construction project?

The best method for creating the strongest concrete mix for a construction project is to carefully follow the recommended mix design provided by a structural engineer or concrete supplier. This typically involves using the right combination of cement, aggregates, water, and additives in the correct proportions, as well as ensuring thorough mixing and proper curing of the concrete.


What are the causes of concrete floor cracks?

Underlying soils movemnent. Adding to much water to concrete mix and getting shrinkage cracks. Not curing the concrete with water and it dries to fast.


What is mean by m20 of grade concrete?

it is concrete mix which gain strength 20kn/mm2 in 28 day of curing....


What are the best techniques for creating a strong concrete mix for building projects?

To create a strong concrete mix for building projects, it is important to use the right proportions of cement, aggregates, and water. Properly mixing and curing the concrete, as well as adding additives like plasticizers or air-entraining agents, can also improve its strength and durability. Testing the mix for consistency and strength before use is essential for ensuring a successful construction project.


What is concrete's setting time?

Dependant on if you have additives with the concrete and how much water is in the mix. In general concrete will achieve 80 - 90 percent strength within in 24 hours


What are the best practices for curing a post concrete mix to ensure maximum strength and durability?

The best practices for curing a post concrete mix to ensure maximum strength and durability include keeping the concrete moist by covering it with a damp cloth or plastic sheet, maintaining a consistent temperature, and allowing enough time for the concrete to cure properly before subjecting it to heavy loads or stress. Proper curing can help prevent cracking and ensure the concrete reaches its full strength potential.


Why shirinkage in concerete?

Shrinkage in concrete occurs due to the loss of moisture during the curing process. As the water evaporates, the concrete material contracts and reduces in volume. This shrinkage can lead to cracks forming in the concrete if not properly controlled. Factors such as mix design, curing methods, and environmental conditions can influence the extent of shrinkage in concrete.


What are the best techniques for using concrete mix for sculpture projects?

The best techniques for using concrete mix for sculpture projects include properly mixing the concrete, using molds or forms for shaping, adding reinforcement for strength, and allowing for proper curing time.


What is the best method for achieving the smoothest concrete mix for a construction project?

The best method for achieving a smooth concrete mix for a construction project is to properly measure and mix the ingredients, use the right amount of water, and ensure thorough mixing and proper curing.


What is the difference between additives and admixtures?

Additives are substances added to a material to improve or alter its properties, while admixtures are specific types of additives used in concrete to modify its properties. Admixtures are typically used in construction to enhance the performance of concrete, such as improving workability, strength, or durability.


What are the common causes of new concrete cracking and how can it be prevented or repaired?

Common causes of new concrete cracking include improper curing, excessive water in the mix, and inadequate reinforcement. To prevent cracking, ensure proper curing, use the correct water-to-cement ratio, and provide sufficient reinforcement. Cracks can be repaired by filling them with epoxy or using concrete patching materials.


What are the Quikrete fast setting instructions for a concrete project?

To use Quikrete fast-setting concrete mix for a project, first prepare the area by cleaning and dampening it. Then, mix the concrete with water according to the package instructions. Pour the mix into the area and level it with a trowel. The concrete will set in about 20-40 minutes, so work quickly. Allow the concrete to cure for at least 4 hours before walking on it and 24 hours before heavy use.