answersLogoWhite

0

To determine the force needed to break a concrete beam containing no aggregate, you'd typically refer to the material's tensile strength or compressive strength. Concrete generally has a low tensile strength, often around 10% of its compressive strength, which can range from 20 to 40 MPa for standard concrete. The force (F) can be calculated using the formula ( F = \sigma \times A ), where ( \sigma ) is the tensile or compressive strength and ( A ) is the cross-sectional area of the beam. Without the specific dimensions of the beam, a precise numerical answer cannot be provided, but this approach outlines the methodology for calculating the necessary breaking force.

User Avatar

AnswerBot

2mo ago

What else can I help you with?

Continue Learning about Engineering
Related Questions

How much cost the aggregate that used for mixing one ton of asphaltic concrete?

First find out how much concrete is needed for your project thwn do the calculations.


How many water is needed to make a concrete of 1 cubic meter of cement?

varies due to moisture content of aggregate and stiffnes of mix needed (slump)


How do you calculate the wastage in concrete?

You need to calculate the total volume of the space that the concrete has to fill. if you're doing a slab 4" thick a cu. yd. will cover 81 sq. ft. Take the total area and divide by 81 to get the number of yard needed.


How do you calculate concrete needed?

length*breadth*depth of the structure=...........m3 of concrete is needed. .


How many bags of cement and sand and aggregate?

To determine how many bags of cement, sand, and aggregate you need, you'll first need to know the specific mix ratio for your project (e.g., for concrete, a common mix is 1:2:3, which means 1 part cement, 2 parts sand, and 3 parts aggregate). Then, calculate the total volume of concrete needed and convert that into the respective volumes of each material based on the mix ratio. Finally, divide the volume of each material by the volume contained in a standard bag (usually 94 pounds for cement) and the bulk density for sand and aggregate to get the number of bags required.


How can I ensure the proper mixing of concrete for my construction project?

To ensure proper mixing of concrete for your construction project, follow these steps: Use the correct ratio of cement, sand, and aggregate. Mix the ingredients thoroughly until they are evenly distributed. Add water gradually and mix until the concrete reaches the desired consistency. Use a concrete mixer for large projects to ensure uniform mixing. Test the concrete for workability and adjust as needed before pouring.


How many bags of concrete are needed per post?

Typically, one bag of concrete is needed per post.


How to calculate how much concrete is needed for a project?

To calculate the amount of concrete needed for a project, you need to determine the volume of the area to be filled with concrete. This can be done by multiplying the length, width, and height of the area. Once you have the volume, you can then calculate the amount of concrete needed by dividing the volume by the coverage area of one cubic yard of concrete. This will give you the total number of cubic yards of concrete needed for the project.


How much minimum aggregate is needed to get a university rank in Anna University?

9.10


What is the conrete mixing ratio in M25concrete?

The Concrete mixing ratio for M35 grade concrete as per IS Mix design is1:1.6:2.907 (cement:Fineaggregate:Coarse aggregate)The ratio obtained is as per design calculations by considering the grade of aggregates and the type of cement used.The Water/cement ration is 0.43


How much concrete do I need for a fence post installation?

To determine the amount of concrete needed for a fence post installation, you should calculate the volume of the hole and then use a standard ratio of 1:2:3 (cement, sand, aggregate) to mix the concrete. Typically, a 50-pound bag of concrete mix will fill approximately 0.375 cubic feet. So, for example, if your hole is 2 feet deep and has a diameter of 8 inches, you would need about 0.25 cubic feet of concrete per post.


How many bags of concrete are needed per fence post?

Typically, one bag of concrete is needed per fence post.