The grade of concrete commonly used for trimix flooring is typically around M30 to M40. This range ensures sufficient strength and durability to withstand heavy loads and wear. Additionally, the mix usually includes a combination of cement, sand, aggregates, and additives to enhance its performance for industrial and commercial flooring applications. Proper curing and finishing techniques are also essential to achieve the desired surface quality and longevity.

User Avatar

AnswerBot

1mo ago

What else can I help you with?

Related Questions

Is Coromandal king 53 grade cement use for m40 grade concrete?

Yes, Coromandel King 53 Grade Cement can be used for M40 grade concrete. This type of cement has a high compressive strength and is suitable for making high-strength concrete mixes, including M40. However, it's important to ensure that the mix design is appropriate and that all other materials used in the concrete, such as aggregates and additives, meet the required specifications for M40 grade.


How much reinforcement steel required in 1 m3 concrete of M50 Grade?

i dn k=12*45


What is cement consumption of cement in CONCRETE 124?

M 15 grade - 1:2:4Cement bags required - 6.5 bagsCement required - 325 kgs


What is the number of bags of cement required for 1 cubic meter of M15 grade cement concrete?

M 15 grade proportion - 1:2:4 (cement:FA:CA)Cement required in kgs - 325 kg per cu.mNo. of bags required - 6.50


What is number of bags of cement required foe 1 cubic meter of M20 grade cement concrete?

M20 - 6.20bags


What is the tonnes of sand required in one cubic metre of grade 25 concrete?

In grade 25 concrete, which typically has a mix ratio of 1:1:2 (cement:sand:aggregate), approximately 0.5 cubic metres of sand is required per cubic metre of concrete. Since the density of sand is about 1,600 kg per cubic metre, this translates to around 800 kg of sand needed for one cubic metre of grade 25 concrete. This amount can vary slightly based on the specific mix design and moisture content of the sand.


What grade of concrete is laid for bed of foundation?

Full basement is the grade of concrete that is laid for foundation.


How much sand and aggregate required for m25 grade concrete?

One cubic metre of concrete weighs 2.5 Tonnes. Typically, 1m3 of concrete is made up of 350Kg of cement, 700Kg of sand, 1,200Kg of chippings and 150 Litres of water.


How does a concrete valley gutter slip form cut the grade in front of the machine?

A concrete valley gutter slip form machine is equipped with adjustable side plates that match the desired grade profile. As the machine moves forward, a cutting shoe at the bottom of the slip form trims and smooths the concrete to achieve the required grade. The machine's sensors and controls ensure accuracy and consistency in cutting the grade as it progresses along the length of the gutter.


How much sand and aggregate required 1 cubic meter of m10 grade cement?

For M20 grade concrete mix proportion=1:1.5:3 And dry volume factor is 54 percent. Hence, we required to find quantities for 1.54 cum concrete. cement required=(1/5.5) x (1.54)=0.27 cum, Sand required=(1.5/5.5) x (1.54)=4.2 cum, Stone chips required=(3/5.5) x (1.54)=0.84 cum.


What is the difference between concrete grade and concrete strength?

concrete grade and strength are both revalent since if grade increase setting time will be less and curing to be done propely so that concrete strength will reach higher. If concrete grade is low curing to done longer days upto intial setting time to reach proper strength


What is C30 grade of concrete?

The grade of the concrete means the concrete compression resistance after 28 days. It is done in Newtons per square millimetre. A concrete of Grade C30 means that the concrete will have a compresion resistance (withstanding a compression) of 30 N/mm2 per square millimetre in 28 days.