In Europe India and China how much does it cost to manufacture a bike?

In india a bicycle is typically manufactured not less than 1000-2000 Rupees.However in Europe it depends upon the quality of bikes such as mountain bikes, Traditional bikes and racing bikes.The Price range can vary from 500-1500 Dollars depending upon the quality and style.In china it can cost near about 500 yuan to 100 yuan. As the cost of Material changes quite often depending upon the market situation , so it will be very difficult to ascertain the recent and most updated manufacturing price of a single unit of bicycle in these respective countries.However these prices can be taken on average in order to get into a resionable discussion on this topic.

Did Overhead Door Corp buy out Wayne Dalton?

Overhead Door Corporation and Wayne-Dalton jointly announced on September 2, 2009 that they have reached a tentative, non-binding agreement in principle, pursuant to which Overhead Door Corporation would acquire Wayne Dalton's overhead door business in North America and Europe. Under the terms of the tentative agreement, Overhead Door Corporation would acquire substantially all of the assets of Wayne-Dalton Corp.'s commercial and residential overhead door business, as well as their Fabric-Shield storm panel business in a cash transaction. Wayne-Dalton Corp. would retain its garage door opener and wireless home access control businesses and will continue to manufacture, market, and sell products of those businesses. The combined company would create North America's premier manufacturer and marketer of overhead doors and openers. http://www.overheaddoor.com/docs/PressReleases/OverheadDoorAndWayneDalton.pdf

What is the difference between mills and factories?

A mill is a premises which entails a complete process of the manufacturing procedure while the factory is the premises in which some part of the whole process is carried out.

Who manufactures M-240 bravo machine gun?

Fabrique Nationale Herstal - USA (FNH-USA) in Columbia, South Carolina.

How does a silk loom work?

i have no idea how the silk loom worked i am asking not answering i saw this link answer this and instead they want me to answer now i know never look up stuff on wiki becausse most information is inaccurate pps this website is just for other people's opinions so that is why you should never use wiki

How do you use Engineer's blue?

1. Extend engineer's blue in one of the mating surfaces.

2. Put the two mating surfaces in contact

3. Put apart the parts and look the results: The contacted parts appear "white" (paint removed) whilst parts than have not contacted remain blue

What was the advantage of the steamboat?

The steamboat as used for water travel. It would transport people and goods from one place to another . They would run on rivers and lakes.

Imagine yourself as manager of TISCO Jamshedpur how will you motivate the employees to achieve more in production?

find www.prakashmba.blogspot.com to get professionalised answer. ..................people, and it is management's job to direct and coordinate these people. This is the leading function and one of the important factor of leading function is motivate his subordinates.

As a manager of well recognized company like TISCO, it is important to maintain graph of the business. To be a competitive in global market the higher production is one of the major part of the same. Which not only depend on the proper planning but also requires the well inputs from the employees mainly by low line workers.

Motivation in the workplace is essential for a good working environment. Different things motivate different people. Most people do work for money, many others work because they love their jobs........................to get full version of answer see www.prakashmba.blogspot.com

Glass is an example of what material?

Glass is an example of an amorphous solid or non-crystalline material. Glass is typically characterized to be brittle and optically transparent.

What similarities and differences are there between profit and profitability?

Profit is a valuable return.

Profitable will be the gain of a selling price that is over price and it sales.
Profit is the total or absolute monetary difference between sales revenues and operating costs. Profitability measures how well a company is making use of it's capital by investing in resources that make goods and services that generate profits

Hindustan Unilever Limited manufacturing plants?

This is a consumer goods company in India. The company is owned by Unilever, which has a 67% ownership in t he Indian company. It was established in 1933.

How do you design a coin pay phone?

You'd have to design a phone, and you'd have to design a coin mechanism to activate the phone. Neither of these things can be described here as writing about either one would prove extensive. Or you could integrate a coin mechanism and a phone, both of which are off-the-shelf- items. Just integrating these two equipments cannot be described here, either. Pay phones are becoming more sophisticated and are capable of handling an electronic transaction to pay for the call. The relevance of this is that the older coin-operated pay phones are being take out of service. And they can be purchased and "back engineered" to find out how they work.

Discuss the systems concepts in Production System?

Discuss the systems concepts in Production System

  1. OBJECTIVE
    System Concept Development begins when the Concept Proposal has been formally approved and requires study and analysis that may lead to system development activities.
    The review and approval of the Concept Proposal begins the formal studies and analysis of the need in the System Concept Development Phase and begins the life cycle of an identifiable project.

    TASKS AND ACTIVITIES
    The following activities are performed as part of the System Concept Development Phase.

    PHASE ONE
    1. Study and Analyze the Business Need
    The project team, supplemented by enterprise architecture or other technical experts, if needed, should analyze all feasible technical, business process, and commercial alternatives to meeting the business need. These alternatives should then be analyzed from a life cycle cost perspective. The results of these studies should show a range of feasible alternatives based on life cycle cost, technical capability, and scheduled availability. Typically, these studies should narrow the system technical approaches to only a few potential, desirable solutions that should proceed into the subsequent life cycle phases.

    2. Plan the Project
    The project team should develop high-level (baseline) schedule, cost, and performance measures which are summarized in the System Boundary Document. These high-level estimates are further refined in subsequent phases.

    3. Form the Project Acquisition Strategy
    The acquisition strategy should be included in the SBD. The project team should determine the strategies to be used during the remainder of the project concurrently with the development of the CBA and Feasibility Study. Will the work be accomplished with available staff or do contractors need to be hired? Discuss available and projected technologies, such as reuse or Commercial Off-the-Shelf and potential contract types.

    4. Study and Analyze the Risks
    Identify any programmatic or technical risks. The risks associated with further development should also be studied. The results of these assessments should be summarized in the SBD and documented in the Risk Management Plan and CBA.

    5. Obtain Project Funding, Staff and Resources
    Estimate, justify, submit requests for, and obtain resources to execute the project in the format of the Capital Asset Plan and Justification,

    6. Document the Phase Efforts
    The results of the phase efforts are documented in the System Boundary Document, Cost Benefit Analysis, Feasibility Study, and Risk Management Plan.

    7. Review and Approval to Proceed
    The results of the phase efforts are presented to project stakeholders and decision makers together with a recommendation to (1) proceed into the next life-cycle phase, (2) continue additional conceptual phase activities, or (3) terminate the project. The emphasis of the review should be on (1) the successful accomplishment of the phase objectives, (2) the plans for the next life-cycle phase, and (3) the risks associated with moving into the next life-cycle phase. The review also addresses the availability of resources to execute the subsequent life-cycle phases. The results of the review should be documented reflecting the decision on the recommended action.

    PHASE TWO
    ROLES AND RESPONSIBILITIES
    Sponsor. The sponsor should provide direction and sufficient study resources to commence the System Concept Development Phase.
    Project Manager. The appointed project manager is charged with leading the efforts to accomplish the System Concept Development Phase tasks discussed above. The Project Manager is also responsible for reviewing the deliverables for accuracy, approving deliverables and providing status reports to management.
    Component Chief Information Officer (CIO) and Executive Review Board (ERB). The CIO/ERB approve the Systems Boundary Document. Approval allows the project to enter the Planning Phase.

    PHASE THREE
    DELIVERABLES
    The following deliverables shall be initiated during the System Concept Development Phase:

    1. System Boundary Document - Identifies the scope of a system (or capability). It should contain the high level requirements, benefits, business assumptions, and program costs and schedules. It records management decisions on the envisioned system early in its development and provides guidance on its achievement. Appendix C-2 provides a template for the Systems Boundary Document.

    2. Cost-Benefit Analysis - Provides cost or benefit information for analyzing and evaluating alternative solutions to a problem and for making decisions about initiating, as well as continuing, the development of information technology systems. The analysis should clearly indicate the cost to conform to the architectural standards in the Technical Reference Model (TRM). Appendix C-3 provides a template for the Cost-Benefit Analysis.

    3. Feasibility Study - Provides an overview of a business requirement or opportunity and determines if feasible solutions exist before full life-cycle resources are committed. Appendix C-4 provides a template for the Feasibility Study.

    4. Risk Management Plan - Identifies project risks and specifies the plans to reduce or mitigate the risks. Appendix C-5 provides a template for the Risk Management Plan.

    PHASE FOUR
    ISSUES FOR CONSIDERATION
    After the SBD is approved and a recommendation is accepted by the program and/or executive management, the system project planning begins. A number of project continuation and project approach decisions are taken by the Project Manager.

    1. ADP Position Sensitivity Analysis
    All projects must ensure that all personnel are cleared to the appropriate level before performing work on sensitive systems. Automated Data Processing (ADP) position designation analysis applies to all DOJ personnel, including contract support personnel who are nominated to fill an ADP position. ADP positions are those that require access to DOJ ADP systems or require work on management, design, development, operation, or maintenance of DOJ automated information systems. The sensitivity analysis should be conducted only to determine an individual's eligibility or continued eligibility for access to DOJ ADP systems or to unclassified sensitive information. Such an analysis is not to be construed as the sole determination of eligibility.

    2. Identification of Sensitive Systems
    Public Law 100-235, the Computer security Act of 1987, requires Federal agencies to identify systems that contain sensitive information. In general, a sensitive system is a computer system that processes, stores, or transmits sensitive-but-unclassified (SBU) data. SBU data are any information that the loss, misuse, or unauthorized access to, or modification of, could adversely affect the national interest, the conduct of DOJ programs, or the privacy to which individuals are entitled under the Privacy Act. Guidelines for the identification of sensitive systems can be found with the DOJ IMSS. These procedures will help determine the type of sensitivity level to the data that will be processed, stored, and transmitted by the new or changed system.

    3. Project Continuation Decisions
    The feasibility study and CBA confirm that the defined information management concept is significant enough to warrant an IT project with life-cycle management activities.
    The feasibility study should confirm that the information management need or opportunity is beyond the capabilities of existing systems and that developing a new system is a promising approach.
    The CBA confirms that the projected benefits of the proposed approach justify the projected resources required. The funding, personnel, and other resources shall be made available to proceed with the Planning Phase.

    PHASE REVIEW ACTIVITY
    The System Concept Development Review shall by performed at the end of this phase. The review ensures that the goals and objectives of the system are identified and that the feasibility of the system is established. Products of the System Concept Development Phase are reviewed including the budget, risk, and user requirements. This review is organized, planned, and led by the Program Manager and/or representative.

What is an intermittent process?

An intermittent process is something that goes on and off a bit any old how, w/o any obvious rhythm to it.

Do MRE's have BPA?

BPA, which stands for bisphenol A, is a compound used in making many plastics used today. It has been in question in regard to negative human heath effects since the 1930's. It has been linked to obesity, neurological issues, breast cancer, reproductive issues and disruption of the dopaminergic system.

For a more generalized bit of information there is a blog that contains some noteworthy information. It's linked below.

What is manufacturing process of asbestos?

Asbestos is generally manufactured by processing mined asbestos fibers.

Highlight the characteristics of good plant layout?

Where a workspace is poorly designed or laid out, cluttered or otherwise inconvenient, workers must perform additional tasks or travel additional distances in order to do their jobs. This means wasted time and effort, which detracts from productivity. A well-designed plant with a good layout allows workers to perform tasks efficiently and with a minimum of extraneous effort.