answersLogoWhite

0

🧪

Concrete and Cement

Buildings today cannot go without concrete and cement. Cement mixed with water, reinforcing steel, sand and gravel, binds all of these components together. When dried, it becomes hard as a rock, which is perfect for buildings and infrastructure.

3,467 Questions

How many concrete bags of 60 lbs does it take to do 2 yards?

To calculate how many 60-pound bags of concrete are needed for 2 cubic yards, first convert cubic yards to cubic feet: 2 yards equals 54 cubic feet (since 1 yard is 27 cubic feet). A 60-pound bag of concrete typically yields about 0.45 cubic feet when mixed. Therefore, you would need approximately 120 bags (54 cubic feet ÷ 0.45 cubic feet per bag).

Why do cement layers purposely put a crack in the sidewalk?

Cement layers intentionally create cracks in sidewalks, known as control joints, to manage the natural process of concrete expansion and contraction caused by temperature changes. These joints guide where the concrete will crack, preventing random and unsightly fissures. By controlling the cracking, they enhance the durability and longevity of the sidewalk while maintaining its aesthetic appearance.

How do you reinforce concrete?

Concrete is reinforced by embedding steel bars, known as rebar, or steel mesh within it before the concrete sets. This combination utilizes the high compressive strength of concrete and the high tensile strength of steel, allowing the structure to withstand various stresses. The rebar is typically placed in a grid pattern, ensuring even distribution of forces throughout the concrete. Additionally, fiber reinforcement, such as steel or synthetic fibers, can also be added to improve the concrete's overall durability and crack resistance.

How many 25kg bags of ballast and 25kg bags of cement are needed to make 1 cube meter of concrete?

To make 1 cubic meter of concrete, you typically need about 350 kg of cement and 700 kg of ballast (aggregates). Given that each bag of cement weighs 25 kg, you would need 14 bags of cement. For ballast, with each bag also weighing 25 kg, you would require approximately 28 bags of ballast.

WHAT WEIGHT CAN A 28 square meter SLAB at 100 mm thick CONCRETE SUPPORT?

To determine the weight a 28 square meter slab of concrete at 100 mm thick can support, we first need to calculate its volume and then its weight. The volume is 28 m² x 0.1 m = 2.8 m³. Given that the density of concrete is approximately 2,400 kg/m³, the slab weighs around 6,720 kg (2.8 m³ x 2,400 kg/m³). The weight the slab can support will depend on factors like the slab's reinforcement and the load distribution, but in general, it can support much more than its own weight.

How much concrete to fill a 6 inch wide hole by 36 inches deep?

To determine the amount of concrete needed to fill a 6-inch wide hole that is 36 inches deep, first calculate the volume of the hole. The hole is cylindrical, so use the formula for the volume of a cylinder: Volume = πr²h. The radius (r) is half the diameter, which is 3 inches, and the height (h) is 36 inches. Thus, the volume is approximately 3.14 x (3 in)² x (36 in) ≈ 339.29 cubic inches, or about 0.197 cubic feet.

What is Duco cement?

Duco cement is a type of adhesive commonly used for bonding materials such as wood, metal, leather, and various plastics. It is known for its strong, long-lasting bond and quick drying time. Typically available in a liquid form, it often comes with a brush applicator for easy use. Duco cement is popular in crafts, model building, and household repairs due to its versatility and effectiveness.

How do you do concrete stone pitching?

Concrete stone pitching involves placing stones or concrete blocks along the edges of a slope or embankment to stabilize the soil and prevent erosion. First, prepare the area by clearing loose debris and leveling the surface. Then, lay the stones or blocks tightly together, ensuring they are embedded in a concrete mix or mortar for durability. Finally, fill any gaps with smaller stones or gravel and compact the area to enhance stability.

How make building cement?

To make building cement, limestone and clay or shale are typically crushed and mixed in a specific ratio. This mixture is then heated in a kiln at high temperatures (around 1,450°C or 2,640°F) to form clinker, which is subsequently cooled and ground into a fine powder. Additional materials, such as gypsum, may be added to control the setting time. The resulting product is Portland cement, the most commonly used type in construction.

Can you cement treated wood to cement?

Yes, you can cement treated wood to cement, but it's essential to use the right adhesive or bonding agent designed for this purpose. Traditional cement may not bond effectively with wood due to the wood's porous nature and moisture content, so a specialized construction adhesive or epoxy is often recommended. Additionally, ensure the surfaces are clean and dry for optimal adhesion. Keep in mind that the treated wood may expand and contract with temperature changes, so flexibility in the bond is also important.

What is the purpose of the concrete pad under the deck pile?

The concrete pad under a deck pile serves to distribute the load of the structure evenly across the ground, preventing settling or shifting. It provides a stable and level base, which enhances the structural integrity of the deck and reduces the risk of damage over time. Additionally, the pad helps to protect the pile from moisture and soil erosion, prolonging its lifespan. Overall, it plays a crucial role in ensuring the stability and durability of the deck.

How much cement do you need for 1 meter cubed of 4 to 1 concrete?

To make 1 cubic meter of 4:1 concrete (which means 4 parts aggregate to 1 part cement), you would typically use about 200 to 250 kilograms of cement. The exact amount can vary based on the specific mix design and desired strength. Additionally, you'll need to account for water and additives, which also affect the total volume and proportions. Always consult a concrete mix design guide for precise calculations based on your project requirements.

How much are concrete planks?

The cost of concrete planks can vary widely based on factors such as size, thickness, and local market conditions. Typically, prices range from $2 to $6 per square foot for standard concrete planks. Additionally, transportation, installation, and any customization can add to the overall cost. For accurate pricing, it's best to consult local suppliers or contractors.

What kind of a grinder do you need to grind concrete?

To grind concrete effectively, you need a concrete grinder, which typically features diamond-tipped blades or discs designed specifically for this tough material. There are several types, including handheld grinders for small jobs and larger, walk-behind models for more extensive surfaces. Ensure the grinder is suitable for the specific task, such as surface leveling, polishing, or removing coatings. Additionally, using a vacuum attachment can help minimize dust during the grinding process.

What is a typical value for the fineness of Portland cement?

The fineness of Portland cement is typically measured by its specific surface area, which is usually expressed in square meters per kilogram (m²/kg). A typical value for the fineness of Portland cement ranges from 300 to 500 m²/kg. This fineness affects the hydration rate and strength development of the cement when mixed with water. Higher fineness generally leads to improved early strength but may also increase the risk of efflorescence and shrinkage.

How many bags of cement needed to mix slab 14 by 11 4 inchesHow many bags of portland cement is needed to mix 1 cubic yds?

To calculate the number of bags of cement needed for a slab measuring 14 feet by 11 feet and 4 inches thick, first convert the dimensions to cubic yards. The volume is approximately 4.58 cubic yards. Generally, one cubic yard of concrete requires about 5 to 6 bags of Portland cement, so you would need approximately 23 to 27 bags of cement for this slab.

How much does it cost for a concrete patio that is 20x20?

The cost of a concrete patio measuring 20x20 feet typically ranges from $1,200 to $4,000, depending on factors such as location, labor costs, and whether you choose basic or decorative finishes. On average, expect to pay between $6 to $12 per square foot for installation. Additional costs may arise from site preparation, drainage issues, or reinforcement materials. Always obtain multiple quotes for a more accurate estimate tailored to your specific project.

What is mixture of cement and concrete sand for roofing?

A mixture of cement and concrete sand for roofing typically consists of a ratio of one part cement to three parts sand, though this can vary based on specific project requirements. This combination creates a strong, durable mortar that can be used for various roofing applications, such as setting tiles or creating a waterproof layer. It’s essential to ensure proper mixing and consistency to achieve optimal performance and longevity in roofing installations. Additionally, additives may be included to enhance properties like water resistance or workability.

What can breathing concrete dust do to you?

Breathing in concrete dust can lead to respiratory issues, including irritation of the airways, coughing, and difficulty breathing. Prolonged exposure may increase the risk of more serious conditions, such as chronic obstructive pulmonary disease (COPD) and lung cancer due to the silica content in the dust. Additionally, it can cause skin and eye irritation. It's important to use protective gear, such as masks and respirators, when working in environments with concrete dust.

Where do we use concrete in a building?

Concrete is commonly used in various structural components of a building, including foundations, floors, walls, and columns. Its strength and durability make it ideal for load-bearing elements, while it also serves in non-structural applications like walkways, patios, and driveways. Additionally, concrete can be used for decorative elements, such as exposed aggregate finishes and precast panels. Overall, its versatility and resistance to environmental factors make it a fundamental material in construction.

How many bags of cement to make 1cubic meter of concrete for M15grade nominal mix?

In an M15 grade nominal mix, the typical ratio is 1:2:4 (cement:sand:aggregate). For 1 cubic meter of concrete, you would generally need about 7 bags of cement, as one bag of cement weighs 50 kg and approximately 0.035 cubic meters of cement is used. Therefore, the total quantity of cement needed for 1 cubic meter of M15 concrete is around 350 kg, which translates to about 7 bags.

Can cement be use in water?

Cement itself is not used directly in water, but it can be mixed with water to create concrete or mortar, which hardens and sets when cured. This mixture is often used in underwater construction, such as in dams, bridges, and marine structures, where it must withstand water exposure. However, cement should not be mixed with excess water, as this can weaken the final product. Proper ratios and curing techniques are essential for durability and strength.

How many bags of concrete for 3 slab?

To determine how many bags of concrete you need for three slabs, you'll first need to calculate the total volume of concrete required for all slabs. Measure each slab's length, width, and thickness, then use the formula: Volume = Length × Width × Thickness. Divide the total volume by the yield of a single bag of concrete (usually around 0.5 cubic feet for a 60-pound bag) to find out how many bags you need.

How much sand and cement will I need to do 10 square meters of rendering?

To render 10 square meters, you'll typically need about 1 part cement to 4 parts sand by volume. For a standard thickness of around 10mm, you will require approximately 0.5 cubic meters of mortar. This translates to about 125 kg of cement (if using a standard 25 kg bag) and around 0.5 cubic meters of sand. Always check specific product guidelines and adjust based on the mix ratio and thickness desired.

What are the disadvantages for cement?

Cement production is energy-intensive, contributing significantly to greenhouse gas emissions, particularly carbon dioxide. It also requires substantial amounts of natural resources, leading to environmental degradation and depletion. Additionally, cement can be susceptible to chemical reactions that weaken its structure over time, such as sulfate attack or carbonation. Lastly, the dust generated during production can pose health risks to workers and nearby communities.