it was £7 a ton! and 379 tons were used! costing a total of .....£3,000!
it cost £8000
the bridge cost about £1.75m :)
on averge hw much does a 3 tooth fixed bridge cost
1,184,000 Euros
The Iron Bridge in Shropshire is the world's first bridge constructed entirely from iron.
The Hell Gate Bridge Cost $70.00 to build.
The Iron Bridge is located in Shropshire, England. The bridge goes over the Iron Bridge Gorge. It is a pedestrian bridge that was built in 1779. The bridge is made of cast iron.
it is the iron bridge
Reportedly, the Rialto Bridge cost approximately 35 dollars to build. The cost of reconstructing the bridge today would require millions.
40003002666
2,000,167.69
$10.00