You will either have to break up the concrete to tie into the under-slab main waste pipe, or you will need to build a subfloor high enough to run the drain pipes underneath, and then connect into the main drain above grade. Keep in mind that you will need some amount of fall (slope) on the pipe, and that you will also need to tie in to the vent stack, or run a new vent through the roof. This should be 4"ABS for a toilet, and 1 1/2" - 2"ABS for a sink or shower.
Drill out the edge of the slab and add some dowels....or cut the slab back.
a home typically has a 4" main drain and that is enough. if it is not 4" you should get a plumbing code and do the math. Can you add a second 3-inch wasteline to an existing 3-inch main house wasteline in order to add the 3rd bath and toilet (this is obviously a 1950's house)?
keep water off of it.. that is about as much as you can add to it
A house is built from the ground up. It starts with a good foundation. This can be either a solid concrete slab or pilings for a house above ground. Then you add walls and a roof.
To install hardwood, first you need a bare floor, then you install the lined paper barrier, then you nail in the hardwood strips, sand it down, and then add a finish such as poly.
No, you could still install a drain through the slab. Would have been easier to do it before the slab, tho.
You would either have to remove the ceiling in the kitchen or the floor in the bath, and add additional joists to strengthen them, or possibly add steel in combination with the joists.
form_title=Bathroom Lighting Design form_header=Install the perfect lighting for your bathroom. What type of fixtures do you currently have installed?What type of fixtures do you currently have installed?=_ Do you wish to add additional lighting?= () Yes () No () Not Sure How many bathrooms need new lighting?= {(),1,2,3,4,5}
Hire someone. This is not a do-it-yourself type of project. The contractor will essentially drill holes in the low parts of the foundation and pump a new concrete mixture (although it is not pure concrete anymore) underneath your current slab, which with enough pressure, will cause it to lift. You will have to have portions of the floor removed (whatever is on top of the slab) to get down to the slab however, so costs can add up quickly, unless you just have carpet everywhere (which is easy to remove and replace).
You have to get 50 or more webkinz. Then go to the map, click "buy room" or "add room" and it will have the option of adding a second floor.
umm to get the secert slab and the other thing you need to do missions ill will add 2 this when i find out some
Drill out the edge of the slab and add some dowels....or cut the slab back.
The verb of additional is add. As in "to add something".
$560.00
Building a concrete slab is not difficult. Simply excavate the area where the slab is to go, and build a wooden box frame around it. Then, add crushed stone and pour the concrete on top. Finally, just smooth it out and allow it to dry.
You might add additional supporting paragraphs to a personal essay if you had additional points to support your thesis.
Kraftmaid bathroom vanities add a touch of elegance, and they hint at the professional touch of a decorator. They are a lovely addition to any bathroom.