36 months may be optimistic, but it is believable from the point of starting construction to going critical. The reason a lot of plants took a long time was due to weaknesses in the licensing process allowing for interruptions and delays at many junctures. This increases construction time and drives up costs substantially.
New regulatory procedures are in place to hopefully reduce this occurrence. For instance, the reactor design is licensed separately and before the plant is built, and there are set time periods for public debate.
Let me just elaborate some on what BCRion has said.
The licensing process in the USA is a two step process. First the utility applies to build
the plant; an action that can be, and frequently is; challenged in court. After a protracted
period of lawsuits and public comment - the construction permit is granted and the utility
can build the plant. After the plant is constructed, the utility has to apply for an
operating license; and the whole process - lawsuits and all, questioning whether the plant
should even exist; starts all over again.
Can you imagine building your home in such circumstances? You convince all the zoning
boards and planning boards that your house will be acceptable to the community and
obtain your building permit. Then after properly construction the house as per the permit,
and as verified by the building inspector; you would then have to apply for a permit to
actually inhabit the house. During this second permitting process; anybody can challenge
any of the features and siting of the now completed house.
That's the way nuclear power used to be licensed in the USA. The Congress has done
some reform of the laws. Hopefully they have instituted a sensible process for licensing
new reactors.
Added- All said and done it takes about/at least 10 years, beginning to end. Including all the licences and permits.
It will take as many days, it depends in how long you have energy to build it.
depending on the size between 3 - 4 years
The first full-scale commercial nuclear power station was built by Westinghouse at Shippingport PA. It was just recently decommissioned after a long uneventful service life.
3 to 5 years
1-2 years
how long does it take to build a asimo
Time It takes To Build Peaking Power PlantIt typically takes one to three years to build a gas turbine power plant depending on the size and complexity. A 100 MW conventional gas turbine may take about a year. A 300 MW combined cycle power plant may take about two to three years. These estimates may increase if demand for gas turbines is high.
2 years
This Is Fake Do not Go On This Website
You could do it in five years. The power station on the ground is almost the same as any fuel-burning power station. The difficulty is drilling several kilometres underground to the hot rocks below, and then drilling a similar shaft a little distance away for water to go down and then up again.
A coal-fired power station can use filters to remove particulate emissions form its smokestack. In theory, it could also capture its carbon dioxide emissions for underground sequestration, but this is an unproven technology and might be neither long-term nor safe storage. The best way for a power station to reduce its carbon dioxide emissions would be to convert to natural gas or to be replaced by a non-combustion source.
Construction of the iss started in 1998 and it was finished in 2011, so calculate that, ummm so it took 13 years to build the international space station!! HOpe I helped:)
The first full-scale commercial nuclear power station was built by Westinghouse at Shippingport PA. It was just recently decommissioned after a long uneventful service life.
3 to 5 years
1-2 years
as long as it rains, and water is stored at a higher elevation than the turbine or impeller shaft of a machine. The power is stored as potential energy and is converted to kinetic energy by the power generating station. This station may convert this potential energy into electricity, in the case of a electrical generator, or the power can be used to directly power a shaft that will run machinery.
The first component ( Zarya Control Module) was launched on 20th November 1998. The station is still being constructed and is approximately 70 percent completed.
Rock caverns are not built they are eroded out of solid rock by natural processes.
Ever since 1954 the tunneling was started and they still are digging. Deepest at 192 feet Hampstead Station.