1.8 Cubic yards of concrete is 48.6 cubic feet. Each 80lb bag of concrete is .6 cubic feet. Therefore, you would need 81 bags. Hope that helps. GEO
0.6 cubic feet in one 80 lb bag. with there being 27 cubic feet in one cubic yard: 0.02 cubic yards per bag, in other words, it would take 45 - 80lb bags to yeild 1 cubic yard of concrete
4.4 bags
0.6 cu yds 0.6 yards is incorrect. According to quikrete's website it would require 46 80# bags of concrete to cover 81 square feet at 4" thick, which is one cubic yard. Dividing 46 by 1 yard gives us approximately 0.022 yards per bag.
The answer is, remarkably, 6. Answer: "6 sack" or "6 bag mix" has six bags of cement per cubic yard of concrete mix. Since each sack/bag contains 94 lbs of dry cement, this equals 564 lbs of cement per cubic yard of concrete.
105 60 lb bags, youll need xtra for spillage 60lb bag = .45 cub ft 81,648 cub ins in 1 3/4 yrds concrete 1728 cub ins = 1 cub ft 81648 divided by 1728 = 47.25 cub ft 47.25 divided by .45 = 105 60 lb bags
15.21 cubic yards 1369 40lb bags 913 60lb bags and only 685 of the 80lb bags.
Assuming a thickness of four inches and allowing about 5% waste, you would need 9.33 cubic yards or about 419 80lb bags.
You will need 3.1 cubic yards or 139 80lb bags. This assumes a waste of about 5% which is typical.
50lb bags 3.7 60lb bags 3.1 80lb bags 2.3 90lb bags 2.1 These amounts are for using the redi-mix bags.
Every 80lb concrete bag should be mixed with 4 quarts or 3.7 liters of water. This mixture will allow you to place aproximately .60cu/ft of concrete. There are 27 cu/ft in a cu/yd. The number then becomes .0222 yards per 80lb bag. Therefore 45 bags of 80lb (4000 psi) concrete ready mix will be enough for 1 yard of concrete.
0.6 cubic feet in one 80 lb bag. with there being 27 cubic feet in one cubic yard: 0.02 cubic yards per bag, in other words, it would take 45 - 80lb bags to yeild 1 cubic yard of concrete
An 80lb bag of concrete you can at your local home improvement store covers about 4 square foot at 2" thick. So you would need about 144 bags of 80lb concrete.
typically one pallet, i believe theres 42 80lb bags on a pallet.
roughly 2900 bags of 80Lbs. bags. (would actually make 64.4 Yds cube better to get trucks and pumper each truck canaries one truck carries about 8-9 Cubic yards
12
Hi, you'd need roughly 2900 bags of 80Lbs. bags. (would actually make 64.4 Yds cubed)
25