this would need some more detail , to be specific ,
and dependant on whether temperature, pressure , level or flow types.
..
generally you should consider the impact if the system fails / would it result in a catastrophic situation arising, resulting a dangerous condition .?
are there any fail safe emergency arrangements needed to continue cooling via pumps, or safety valves to control a pressure safely.
is the new system about to be commissioned the right type for the application ?
..
is installation - method the correct one.?
are the sample and return pipelines set up correctly ?
are there any intrinsic - safety requirements?
should a valve stem or piece move during its operation ; will it clear any local objects or strike them resulting in a failure ?
.
is the electrical system designed suitably for the power consumption ?
are there any IP - protection sealing requirements needed ?
.
if the application involves a flow measuring system ;
the isolation -- valves should be commissioned by equalising the pressures across the instrument manifold.
then opening slowly theLP low pressure isolator, and then fully,
and finally opening the HP isolator to commission the instrument .
600 WATT
Pre-commissioning and commissioning are words used in the engineering field. Pre-commissioning begins many months before the start of the project. During this phase duties are assigned.
MECHANICAL MAINTENANCE,COMMISSIONING ERRCTION OF MACHINARIES,UTILITIES ETC Construction,errection,commissioning,and maintenance
Installation of a system or machinery up to the point of being able to start running is erection. Commissioning is preparing for running or taking into use of the installed system or machinery by making preliminary tests and checks (pre-commissioning) and initially running the system or machinery or taking it into use while checking and setting all of its running parameters in accordance with its design (hot commissioning).
Systems Commissioning is the process of testing final versions of software, hardware and configuration in their final locations. Once completed, it is "Live" (Available for use) and will not require further testing.
asdsfsdafdsadsf
shal i get any book the same Every Commissioning has its way and steps. We use software for commissioning the BTS. Every Software tool has some steps. By following that steps, we can do commissioning
Ultra BTS commissioning typically involves configuring the base transceiver station (BTS) equipment, integrating it into the network, performing functionality tests, optimizing settings for optimal performance, and finally activating the BTS for commercial operation. This process requires coordination between the BTS manufacturer, network operators, and other stakeholders to ensure seamless integration and operation. It is essential to follow manufacturer guidelines and industry best practices to ensure successful commissioning of the Ultra BTS.
the basic difference between nokia ultra&flexibts is that ultra can support only12 trx but flexi bts can support 24 trx. i
A Base Transceiver Station (BTS) Engineer serves an important part in the cellular network communication field. The BTS engineer handles cell site installation, development, and commissioning of the Mobile Station (MS) network.
full load on one bts site 35 amp.
FIU and RRI both are connect to ODU of microwave antenna. The difference is RRI is used in ultra BTS where as FIU is used in Flexi BTS.
600 WATT
only two trx supported when we use one m2ha.
Flexy home is a house :D
Flexy home is a house :D
3g BTS is greater than 2g bts. and it is with new technologies.