Want this question answered?
Over excavation refers to the process of excavating or digging a site beyond the specified or required depth or dimensions outlined in the construction plans or engineering design. This situation can occur intentionally or unintentionally and has implications for the construction project. Here are some key points: **Intentional Over Excavation:** In some cases, engineers or construction professionals may intentionally over excavate to address certain site conditions or to achieve specific design requirements. This might be done to remove unsuitable soil or to create a level and stable foundation. **Unintentional Over Excavation:** Unintentional over excavation can happen due to errors in surveying, miscommunication, or misinterpretation of project specifications. It may lead to additional costs and time delays in the construction process. **Reasons for Over Excavation:** Addressing poor soil conditions: If the soil at the construction site is unsuitable or lacks the required bearing capacity, over excavation may be necessary to reach more stable soil layers. Creating a level base: Achieving a level and uniform foundation is crucial for the stability and structural integrity of buildings. Over excavation may be necessary to establish the desired foundation depth and slope. **Implications:** **Costs:** Over excavation can result in additional costs for labor, equipment, and disposal of excess soil. **Time Delays:** The need to rectify unintentional over excavation can lead to delays in the construction schedule. **Environmental Impact:** Disposing of excess excavated material may have environmental considerations, and proper disposal methods need to be followed. **Prevention and Mitigation:** **Accurate Surveys and Plans:** Careful surveying and accurate construction plans can help prevent unintentional over excavation. **Clear Communication:** Effective communication among project stakeholders, including engineers, surveyors, and contractors, is essential to avoid misunderstandings. **Adherence to Specifications:** Ensuring that excavation activities adhere to project specifications and engineering design can help mitigate the risk of over excavation. In construction projects, it is crucial to strike a balance between achieving the necessary excavation for a stable foundation and avoiding unnecessary or unplanned over excavation to control costs and adhere to project timelines.
Construction workers need proper nutrition to keep energy levels up on the job to reduce stresses on the body and to increase to maximum their productivity on construction sites.
Limit of retention is the maximum amount that can be retained in the construction contract. Suppose the retention % is 5% and limit of retention is 10%. On a contract value of Rs100.00. The first claim amounts to Rs20.00. Retention is Rs1.00 and net payment is Rs 19.00
It stand for maximum achievable control technology
This particular product due to it's sturdy construction can support a maximum weight of 50lbs.
sir, i want to know about maximum demand controller, to control electricity maximum demand is required for industries to avoid any penalty, thanks.
To obtain maximum control of the economy.
3 and 7
yes. birth control is about having a certain number of children. in china, there is birth control and you can have maximum of 2 kids.
The T indicates a speed rating of 118 mph maximum. The R stands for Radial construction.
four
experimentation