The supply is given on the high voltage side of transformer because the supply voltage required to circulate rated current through

the transformer is usually very

small

So energy is saved.

User Avatar

Wiki User

12y ago

What else can I help you with?

Related Questions

What is the purpose of open circuit test and short circuit test of a transformer?

An open-circuit test is done with the transformer running at its rated voltage but with no load. This measures the power lost in the magnetic core. (IR Losses) A short-circuit test is done with the transformer running at its full rated current in all windings but at a low voltage. The secondary is shorted and the primary voltage is adjusted to give the rated current. This measures the power lost in the copper windings. (Copper losses)


What are the approximation of open circuit and short circuit test of transformer?

A short-circuit test is done to determine the power lost in the resistance of the primary and secondary windings of the transformer. It is done at full load current but with only enough voltage to give the required current with the secondary short circuited. An open-circuit test is done at full load voltage but no current is taken from the secondary, and this enables the power lost in the magnetic core of the transformer to be measured. As well a power, the tests also allow the inductances to be measured as well as the resistances, in order ot characterise the transformer fully.


Why the iron losses absent in short circuit test?

Because a short-circuit test is done at very low voltage to check the transformer windings on their maximum current. The low voltage ensures that the magnetic flux in the transformer's iron core is very low so that the eddy-current losses, usually known as iron losses, are negligible.


Why in no load test transformer is connected on low voltage side?

A no-load test is done with the normal supply connected in the way the transformer is intended to be used. It is also known as an open-circuit test to distinguish it from a short-circuit test, and its purpose is to measure the power loss in the iron core of the transformer and the no-load current drawn from the supply.


What losses can be measured in a short circuit test of a transformer?

Winding copper losses of a transformer can be measured in a short circuit test of a transformer. Impedance voltage is given to the primary and the secondary is often shortcircuited. (some times the reverse is done of this). Full load currents are made to flow in both primary and secondary circuits. This current flow heats up the 2 windings of the transformer. Power consumed at this time gives the transformer copper losses.


Can fused feeders for the line side of a transformer pass through the same gutter with the load side of the same transformer?

As long as the voltage insulation factor of the conductors are the same and they are of the same circuit fed by the primary side of the transformer's disconnect switch then yes the two feeders can be run together. It is not usually done though because the transformers feeders usually start at an MCC or splitter of one voltage and the load side of the transformer usually goes to a distribution point of some sort at a different voltage.


Why short circuit test is done at high voltage side?

1)Short circuit test is performed at rated current. As the rated current on high voltage side is much less than low voltage side, so the rated high voltage side current is easily achieved compared to low voltage side. 2)Also because we cannot short circuit high voltage side, as, if we short circuit high voltage side, voltage of high voltage side essentially falls to zero and since VI=constant, so the high voltage side current will be very high and will burn the winding.


How will you convert a open current circuit to a open voltage circuit?

The first thing you need to know is the internal resistance of the current source, the voltage source will have the same internal resistance. Then compute the open circuit voltage of the current source, this will be the voltage of the voltage source. You are now done.


Can you put transformers in series to double your voltage?

You can if done carefully. The neutral of one transformer must be set up to be at the positive voltage of the other transformer. This might require an intermediate step transformer that is center tapped (so three instead of 2 transformers).


What is the purpose of a test for a doorbell transformer and how can it be conducted effectively?

The purpose of testing a doorbell transformer is to ensure that it is functioning properly and providing the correct voltage for the doorbell system to work. This can be done effectively by using a multimeter to measure the voltage output of the transformer. Simply set the multimeter to the AC voltage setting, then touch the probes to the terminals of the transformer to get a reading. A properly functioning transformer should provide a voltage within the specified range for the doorbell system to operate correctly.


Can you step down a 220v to a 110v without a transformer?

It is not possible to step down voltage from 220V to 110V without using a transformer or other voltage conversion device. Transformers are specifically designed to change voltage levels while maintaining power flow. Attempting to step down voltage without a transformer can risk damaging electrical devices or causing a safety hazard.


What is the amount of work done by an electric circuit?

The amount of work done by an electric circuit is equal to the product of the voltage applied to the circuit and the total charge that flows through it. Work done (W) = Voltage (V) x Charge (Q) = V x Q.