answersLogoWhite

0

it is read in tenths of a foot, engineers scale

User Avatar

Wiki User

15y ago

What else can I help you with?

Related Questions

How do you read a leveling rod?

when the bubble in the center is centered its level


What is the Two basic surveys in route surveying?

leveling and traversing


What is inverse leveling in surveying?

Inverse leveling is a method in surveying where the difference in elevation between two points is calculated by taking reciprocal leveling observations. This technique helps to determine the height difference between points that cannot be directly measured due to obstacles or long distances. By using the principle of reciprocal leveling, the accuracy of leveling measurements can be improved.


What are the types of leveling rod?

There are several types of leveling rods, primarily including: Fixed Height Rods: These are standard rods with a set length, often used in basic leveling tasks. Telescopic Rods: These rods can be extended or retracted, allowing for adjustable height, which is useful in various surveying conditions. Digital Rods: Equipped with electronic components, these rods provide digital readings for more precise measurements. Each type serves specific purposes in surveying and construction.


What is the fundamental difference between surveying and leveling?

Surveying involves measuring and mapping the three-dimensional positions of points on the Earth's surface, while leveling focuses on determining and establishing the elevation differences between points. Surveying is more comprehensive and involves determining both horizontal and vertical positions, whereas leveling is primarily concerned with vertical positioning along a level line or plane.


Difference between leveling and surveying?

Leveling is a technique used to determine the height or elevation differences between points on the earth's surface, typically for construction or engineering purposes. Surveying involves measuring and mapping specific points on the earth's surface, including horizontal and vertical locations, to create accurate representations of land features or boundaries. Leveling is a component of surveying, used to capture elevation data during the surveying process.


Why is levelling important in surveying?

Leveling in surveying is important to get an accurate measurement. The rise and fall of the grade will cause the measurements to be off, resulting in an inaccurate measurement of plots of land.


How long is a rod in land surveying?

In land surveying, a rod is typically 16.5 feet long. It is a common unit of length used for making linear measurements in the field.


What scientific instrument is used for measuring short vertical distances?

A leveling rod or a stadia rod is commonly used for measuring short vertical distances in surveying and construction projects. The instrument is typically marked with precise increments to help accurately measure changes in elevation.


What is called the reading on a leveling rod held of a point of known elevation?

The reading on a leveling rod held at a point of known elevation is called a backsight reading. This reading is used as a reference point to determine the elevation of other points during leveling surveys.


What is the difference between leveling and surveying?

Surveying measures angles and distances, usually in three dimensions. Leveling only meaures the elevation change between two or more points. One of the crudest leveling instruments is simply a hose filled with water. If the two ends of the hose are held at the same height, no water flows out. If one end is lower, the water flows out that end.


How do you calcuate height of instrument in surveying?

When surveying using a "level" instrument , the "level" instrument is set-up and adjusted to level by adjusting the screws. When surveying you have an instrument person and a rod person. When trying to find the height of the instrument, the rod person places there rod over a "known" elevation, either a benchmark or a temporary benchmark that has a known elevation. To get the height of the instrument, you need to "shoot" the level to the rod person holding the rod on the known elevation, this is called the "Backsight". This elevation will be read by the instrument person, and recorded in the survey field book. This value backsight elevation will then be added to the known elevation of the benchmark or the temporary benchmark, to get the height of instrument. HI = known elevation + BS Height