M20 - 6.20bags
In an M20 concrete mix, which has a ratio of 1:1.5:3 (cement: sand: aggregates), approximately 7 to 8 bags of cement are needed for one cubic meter of concrete. This translates to about 350 to 400 kg of cement, considering a standard 50 kg bag. The exact number may vary based on factors like waste, mix adjustments, and specific project requirements.
1 bag
Yes. OPC 43 grade cement can be used to make M20 grade concrete.It can be used to make concrete up to M30 Grade.See related link.
260 kg/cu m
M20 - 6.20bags
concrete and cement
For M10 (1:3:6) Grade of concrete cement bag consumed = 4.4 bags/cum M15(1:2:4) Grade of concrete cement bag consumed = 6.6 bag/cum M20(1:1.5:3) Grade of concrete cement bag consumed = 8.2 bag/cum
In an M20 concrete mix, which has a ratio of 1:1.5:3 (cement: sand: aggregates), approximately 7 to 8 bags of cement are needed for one cubic meter of concrete. This translates to about 350 to 400 kg of cement, considering a standard 50 kg bag. The exact number may vary based on factors like waste, mix adjustments, and specific project requirements.
1 bag
M20 grade - 1:1.5:3Cement required - 360 kgs per m3Cement required - 7.2 bags.
Yes. OPC 43 grade cement can be used to make M20 grade concrete.It can be used to make concrete up to M30 Grade.See related link.
260 kg/cu m
1:1.5:3:0.45 (cement,fine aggregate,coarse aggregate, water cement ratio)
It depends on the Grade of Concrete. general grades are M15, M20, M25 etc. here are the nos. of bag required -------------------Bag for 1 cum---------------Bag for 5 cum M15------------------- 6.4----------------------------32 M20-------------------- 8-----------------------------40 M25--------------------12----------------------------60
Usually for a design mix as per Indian Standards when the mix proportions are arrived for M25,the total cement consumption will be around 400 kg.From that the number of cement bags will be 8 numbers for 1 cum
how much tensile strength of M20 grade concrete at 28 Days