The typical requirement of ironite for cement can vary based on the specific blend and desired properties of the final product. Generally, ironite is added in small percentages, often around 2-5% of the total cement weight, to enhance color and improve certain physical properties. For precise formulation, it is essential to conduct tests to determine the optimal amount for your specific application. Always refer to manufacturer guidelines or industry standards for specific recommendations.
The amount of fuel required to evaporate 1 kg of water in a spray drying tower varies based on factors such as the efficiency of the drying process and the type of fuel used. Generally, it takes about 1.5 to 3 kg of fuel to evaporate 1 kg of water, depending on the specific energy requirements of the system and operational conditions. Efficient systems may reduce this ratio, while less efficient ones may require more fuel.
The cost per kilogram of liquefied petroleum gas (LPG) can vary significantly based on factors such as geographic location, market demand, and global oil prices. As of recent data, the price typically ranges between $0.50 to $1.50 per kg, but it is advisable to check local suppliers for current rates and any applicable taxes or fees. Additionally, prices may fluctuate due to seasonal changes and economic conditions.
Density is the ratio of an object's mass divided by its volume. The standard international unit to measure density is kilograms per cubic meter (kg/m3).
200 kg @ max load capacity of 85% = 306 Litres
It is easy to calculate Heat load if you know fuel Consumption in Heater. e.g -- If you are using Furnace Oil as Fuel and u are consuming 1000 Kg per day Then Heat Load per day will be = Calorific Value of FO x Fuel Consumption
for preparing cement mortar C.M.(1:6) number of cement bags required are nearly 5.14 bags.calculation: for preparing 1 cu.m wet C.M(1:6), dry material required is 25% extra.therefore dry material required is 1.25 cu.mhence cement required=1.25/(1+6)=0.178 cu.m(sand required=0.178*6=1.068 cu.m)density of cement=1440 kg/cu.m=>cement required in kg=0.178*1440=256.32cu.mwt. of cement in kg per bag=50kgtherefore no. of bags required is=26.32/50=5.14bags.thank u.
M 15 grade proportion - 1:2:4 (cement:FA:CA)Cement required in kgs - 325 kg per cu.mNo. of bags required - 6.50
0.1865 bag
315 Kg/M3 approx.
50 kg gross
1 USD per ton oh ulo moh!!
M20 grade - 1:1.5:3Cement required - 360 kgs per m3Cement required - 7.2 bags.
1 bag
To hydrate a 50 kg bag of cement, approximately 25-30% of the cement weight is typically required in water, meaning around 12.5 to 15 kg of water is needed. This amount can vary based on factors such as the type of cement, environmental conditions, and specific mix designs. It's essential to follow guidelines and adjust based on the desired workability and strength of the final product.
To determine how many 50 kg cement bags are required for 1 cubic meter of Grade 30 concrete, we need to break down the mix ratio and calculate the cement content based on that. Grade 30 Concrete Mix Ratio Grade 30 concrete typically has a mix ratio of 1:2:3 (Cement: Sand: Aggregate) by volume. This means: 1 part cement 2 parts sand 3 parts aggregate (gravel) However, the actual proportion of cement required can vary slightly depending on the specific mix design used by a contractor or engineer. For standard Grade 30 concrete, the cement content is typically around 350 to 400 kg per cubic meter. Since each cement bag weighs 50 kg, the number of bags required for 1 cubic meter of Grade 30 concrete would be: Number of bags = 350 kg / 50 kg = 7 bags
unit weight of cement, Portland is 1506 kg/cu.m unit weight of cement, mortar is 2162 kg/cu.m cement, slurry is 1442 kg/cu.m
26 bags (40kgs cement bag)