answersLogoWhite

0

🌼

Flooring

Floors can be a challenge to install, maintain and change. Questions regarding the installation, maintenance and repair of carpets, tile, wood and other materials go here.

6,242 Questions

Can you use a shark seam cleaner on hardwood floors?

A Shark Steam Cleaner can be used to clean hardwood floors. All of the surfaces safe to clean with the steam cleaner can be found within the instructions of the product.

What type of cleaner to use on travertine floors?

Custom Building Products has a StoneSpecific line that will give you anything you might need. They are available at all Home Depots and are a fairly good price. http://www.custombuildingproducts.com/docs/CareBrochure.pdf?user=pro&lang=en If you want to stick to something more generic then use things that have a neutral pH make sure to avoid things that contain lemon or vinegar. Also read the back label most will tell you if they are safe to use on stone.

When can you put painter's tape on newly finished wood floor?

Painter's tape or any other kind of tape should never be used on a wooden floor. Even though the newly-finished floor may be cured, the tape can remove the finish. To cover the wooden floor, tape the drop-cloth to the baseboards.

Can you steam mop a vinyl floor?

The Bissell steam mop can be used to clean a vinyl floor. In fact it can also be used on marble, ceramic, stone, laminate, linoleum and sealed hardwood floors.

How do you remove one broken slate floor tile?

To properly remove a broken tile without damaging the surrounding tiles the following steps should be taken: * tape off the surrounding tiles to avoid scratching or damage * CAREFULLY remove the existing grout around the broken tile using a grout scraper or similar tool * using a hammer and chisel, carefully break out the object tile starting in the center * remove the old setting material, hopefully thin-set or other cementatious material, with the hammer and chisel or other heavy scraping tool. Be very careful as you approach the surrounding tiles not to damage or scratch them. This just means more tiles to remove. * after the sub-strate has been cleaned, mix a small batch of setting material according to the instructions on the package. * if using thin-set or other mortar as your setting material, always lightly moisten the floor to prevent the floor material absorbing too much miosture from the mortar leading to premature drying and a weak bond. * using a proper size square notch trowel, apply a uniform coat of mortar to the exposed floor, then carefully apply a thin coat to the back of the new slate tile using the straight edge of the trowel [ this is called "back buttering" ] * place the new tile in position and press down to remove any air bubbles and to level the new tile to the old tiles. once the new tile is level, properly space for grout line. * allow to dry or set overnight before applying new grout[ again follow the instructions on the package of grout very carefully] * after cleaning up, enjoy a job well done!

1177 sq ft of floor how much carpet do you need?

1177 square feet translates to 131 yards of carpet if there are no matches to be concerned with.

130.7778 sq yards or 109.3469 sq metres

Vacuum dewatered flooring?

This specification defines the material, mixing, placing, curing, constructional and other performance requirements for VACUUM DEWATERING CONCRETE SYSTEM for foncrete floor slab. Any other special requirements shown or noted on the drawings and directed by the Engineer-in-Charge shall govern over the provision of this specification.

Actual work shall be Carrie out in accordance with this specification and in consultation with specialised firm undertaking the job to suit specific requirement at site such as rise and fall of the floor slab, providing dowels for pedestals etc.

In case of conflict between clauses mentioned in this specification and those in any Indian Standard, this specification shall grown.

MATERIAL:

All materials of construction like cement, aggregatre, sand, water etc.

GRADE OF CONCRETE:

Minimum grade of concrete used shall be M15 conforming to IS-456. Only Design Mix Concrete shall be used. For other details like proportioning, batching, mixing, placing, curing etc.

WATER

SCOPE:

This specification defines the material, mixing, placing, curing, constructional and other performance requirements for VACUUM DEWATERING CONCRETE SYSTEM for foncrete floor slab. Any other special requirements shown or noted on the drawings and directed by the Engineer-in-Charge shall govern over the provision of this specification.

Actual work shall be Carrie out in accordance with this specification and in consultation with specialised firm undertaking the job to suit specific requirement at site such as rise and fall of the floor slab, providing dowels for pedestals etc.

In case of conflict between clauses mentioned in this specification and those in any Indian Standard, this specification shall grown.

MATERIAL:

All materials of construction like cement, aggregatre, sand, water etc.

GRADE OF CONCRETE:

Minimum grade of concrete used shall be M15 conforming to IS-456. Only Design Mix Concrete shall be used. For other details like proportioning,batching, mixing, placing, curing etc.

WATER-CEMENT RATIO:

Water-cement ratio upto 0.65 shall be allowed to obtain better slumb & workability. Actual ratio shall be decided with approval of the Engineer-in-charge. Only measured quantity of water shall be used in the mix.

SPECIAL REQUIREMENT:

All works covered by this specification shall be crried out by an experienced agency having sufficient expertise in vacuum dewatering concrete system. Only skilled and experienced operators shall be employed for the purpose. Prior approval of the agency shall be obtained from the Engineer-in-Charge before starting the work. All the equipment shall be of approved and proven types and suitable for the work involved.

CONCRETE LAYING:

Concrete laying pattern shall be decided in consultation with the Engineer-in-Charge and with his approval. The maximum width of a slab strip shall not generally exceed 4 metres and minimum number of construction joints shall be used. Alternate slab strips shall be sequentially laid. Any damage to the already finished top surface shall be avoided. At construction joints no overflow of mortal or slurry on the already hardened surface shall be allowed while concreting the intermediate slab strip. Such construction joints shall be marked with a thread in a straight line while the concrete is still green. Continuity of reinforcement shall be maintained while laying concrete in slab strips. Edges at expansion joints shall be protected and proper arrangement of shear-transfer shall be provided standards.

CONCRETE COMPACTION:

After placing concrete in position, it shall be vibrated thoroughly using poker/needle vibrators and thereafter leveled with surface vibrators to produce a homogeneous and smooth concrete surface. In order to achieve a smooth surface to the satisfaction of the Engineering-in-Charge, surface vibrators shall be very carefully used by skilled operators. Over vibration resulting in excess mortar near the surface shall be avoided.

DE WATERING:

Suction mats shall be spread over the leveled fresh concrete surface and shall be connected by suction hose to the vacuum pumps for De-watering of surplus water in the concrete. During De-watering it shall be ensured that no cement/cement slurry is pumped out.

FLOATING & TROWELING:

This shall be done after De-watering by using skim floater(power floater. After this, surface shall be troweled with minimum two passes of power trowel to achieve a wear resistant surface to the satisfaction of the Engineer-in-Charge.

CURING:

However, all care shall be taken to avoid any stain any permanent stain on the surface. Any stain or permanent marking on the top surface shall be removed by approved means.

APPROACH WORKING PLATFORM & FORM WORK:

The Contractor shall arrange all arrange all approaches, scaffolding, working platforms etc. for carrying out the entire operation safely and in a work-man-like manner. The working area shall be nearly maintained and all the facilities required by the Engineer-in-Charge for proper supervision of the work shall be provided.

TESTING OF FINISHED FLOOR:

Contractor shall arrange for core cutting and testing of finished concrete over and above other field tests. Cores shall be taken after 28 days of concreting and tested as per relevant IS Codes. Core test results shall be compared with the normal cube test results taken from the same concrete. The average compressive strength of cores shall be minimum 40% higher than that of normal cube (15cm x 15cm x 15xm) test results. Minimum three cores for each day's work in the initial stages and as decided later by the Engineer-in-Charge shall be taken. The floor shall be properly rectified after cutting the cores with concrete of same mix using the same cement as earlier used and finished smoothly to match with the existing surface. The cut surface of the floor-concrete shall be coated with proper epoxy-based bonding compound before laying concrete to avoid shrinkage cracks or, alternatively, a non-shrink compound shall be added with concrete.

PAYMENT:

This clause shall apply to Item Rate tender only.

Payment shall be made on cubic meter(m3) basis of actually finished work or as calculated from the approved construction drawings, whichever is less. The reinforcement used shall be measured and paid separately on weight basis.

If you need Vacuum De-watering concrete flooring job work you can contact us:

What is seam?

A seam is made when two or more layers of fabric are stitched together.

Are you ment to tip carpet fitters?

Yes if they do a nice job and show respect for you and your home.

How do you calculate 545 sq ft of tile 12by12?

545 tiles, as one tile is 1 sq. ft. Divide total square footage by 1.

If carpet is 34 a square yard how much is it in square feet?

There are 9 square feet in a square yard, so 34 divided by 9 is $3.78 a square foot.

How much does it cost to have pine boards planed?

It would depend on how many you have and how much stock needs to be removed. Consider buying a decent planer and doing it yourself. Good stock planers can be purchased for $275-$500.

How do you find the highest point on a long floor?

Take a long piece of string or twin that you can pull tight. One person go to one corner, or side, of the room and the other opposit of them. Press the string down on the floor and the other person pull tight while pressing their end of the string on the floor. By pulling tight is should show where the floor is and isn't touching the string.

Can you clean laminate flooring with steam?

No!!!! Please don't do this. You will ruin your floor. no, never. Steam cleaners and steam mops leave to much water on a laminate floor.

What is the best way to install flooring over the main drain in a basement?

Firstly check with the Water Authority/Local Authority that the drain is not a sewer shown on the map of sewers. If it is in fact a drain it should only serve one property, however. If it is no then it might be a private sewer that serves more than one property. If it only serves one property it is a drain and in this case and in the case of it being a private sewer it will need to be protected against damage from floor loads. I suggest you ask the advice of your Building Control Deapartment at your local Council as bot both protective measure and accessibility measures may be required.

How many square yards are in 10 feet by 12 feet?

There are 13.33 square yards in a 10 x 12 foot area. (13 1/3 square yards)

There are 9 square feet in a square yard.

10 x 12 = 120 square feet = 120/9 square yards = 13.33

What is the average labor cost of installing laminate flooring?

depends on what area of the country you live in. In the southwest you can expect to pay $2.00 - $3.00 for a licensed, bonded and insured installer. Given the current state of the economy you might find it for less. But, please beware that in the end you get what you pay for. I would always recommend finding an established retailer or installation company to perform any work in your home. Answer Most times the installation is roughly the same as the cost of the material you want installed.

What is the cost of oak flooring per square foot?

This completely depends on where you are and where you intend to purchase your flooring. Some places sell real oak flooring for as cheaply as 89 cents per square foot, while other flooring stores may charge you as much as $4.00 per square foot. Hardwood floors in general tend to be more expensive than other types of flooring (like tile or vinyl), with Macassar ebony tending to be the most expensive kind of hardwood flooring per square foot (often reaching $150 or more).

Oak flooring is generally considered affordable and, with a little searching, can be found for under a dollar per square foot.

What is vacuum dewatered flooring?

Process In this system, concrete is poured in place & vibrated with a poker vibrator. Then a screed vibrator is run over the surface, supported on channel shuttering spaced 4.0 meters apart. The screed vibrator is run twice to achieve optimum compaction & leveling. After this a system of lower mats & top mat is laid on the green concrete & this is attached to a vacuum pump. This draws out excess water.

Benefits 1. Compressive strength of floor increases by upto 60% 2. Tensile strength increases by @ 70% 3. Cement consumption is reduced to the extent of 40%, no cement is required separately for finishing the surface. 4. Abrasion resistance of the floor increases by @ 60% resulting in les wear and rear of the floor surface 5. Shrinkage of concrete is reduced and floor wraps less.