How many hours do civil engineers work a day?
Most Civil Enginners work between 50 and 60 hours per week
any engineer can even work 5 hours a day and still get payed either $5,000 to $10,000 dollars anyway
Grades of high tensile steel are based on their tensile strength and heat resistance. The best of these are used in axles and other high stress constructions that are required to operation safely.
What is lap Length of steel Bars?
Over lap of steel bar is provided 60 times of dia of steel bar. For example (.5") dia steel bar overlap length is (30"). (.5x60=30")
What is the Mix ratio for M 7.5 concrete?
For M7.5 the ratio is 1:4:8 i.e 1 part of cement, 1 part of fine aggregate (Sand) and 1 part of coarse aggregate.
What is structural Efficiency?
Structural Efficiency= Maximum Mass Supported _______________________ (Divided By) Mass of Structure
The man who invented the Nobel Prize was Alfred Bernhard Nobel was born in Stockholm, Sweden on 21 October 1833. The man who invented the Nobel Prize was Alfred Bernhard Nobel was born in Stockholm, Sweden on 21 October 1833.
it is a roadbase material consisting of crushed rock/slag usually premixed with controlled amount of water sufficient for adequate compaction.
a single groyne cost about £5,000 per metre
http://www.mjanderson.chislehurst.btinternet.co.uk/coastseadefence.htm
this is where find more of the cost of sea defences
:D
Rebar locators are used to find exactly where the reinforcing steel is located under concrete in existing materials. They are most often used for renovation or remodeling projects.
What high school subjects are required to study mechanical engineering?
honors physics / ap physics
honors pre-calculus / ap calculus AB/BC
honors chemistry
engineering
mechanics
When was engineering invented?
i dont know when it was invented but the first engineering department was introduced for defense purpose
AnswerEngineering wasn't 'invented'; it evolved over time -probably reaching its peak during the Industrial Revolution.
Advantages and disadvantages of the shear box test?
Advantages:
1) The test's simplicity and, in the case of sands, the ease of specimen preparation.
2) The travel of the machine can be reversed to determine the residual shear strength values, which is shear strength parameters at large displacements.
3) Shear box represents a cheaper method in determining the drained shear strength parameters for coarse-grained soil. Preparing soil samples for other testing methods is relatively difficult and expensive.
disadvantages:
1) The main one: drainage conditions cannot be controlled.
2) As pore water pressure cannot be measured, only the total normal stress can be determined, although this is equal to the effective normal stress if the pore water pressure is zero.
3) Only an approximation to the state of pure shear is produced in the specimen and shear stress on the failure plane is not uniform, failure occurring progressively from the edges towards the center of the specimen.
4) The area under the shear and vertical loads does not remain constant throughout the test.
What is the ultimate yield strength of astm 1018 steel?
ASTM 1011 comes in many grades which determine the yield strength ie:1011 gr 42 would have a min yield of 42,000 psi
How do you draw shear force and bending moment diagram for frames and arches?
There are two ways to draw the shear and moment diagrams. First is by writing the shear and moment equations and the other which is more rapid is by using the relationship between load, shear, and moment. For any of the two methods, the first step is to find the reactions at the support(s).
Shear and moment diagram by writing the shear and moment equations
Cut the beam in every segment where there is a change of load. Draw the free body diagram to the left of each exploratory section. Write the shear and moment equations and with these equations, you can easily draw the shear and moment diagrams. For examples and the detailed step by step step instruction on how to do this can be found by the link below:
Using the relationship of load, shear, and moment
Drawing the shear and moment diagrams by using the relationship between load, shear, and moment is more rapid than writing the shear and moment equations. The relationship are as follows:
For more in depth discussion of this subject with illustrations and solved problems, consider to visit the link provided below:
Would you capitalize Doctorate in civil engineering?
Only if accompanying a name, as their job title.... John Q. Citizen, Civil Engineer.
It would not be capitalised when used in a sentence.... "We will need to employ a civil engineer before we begin the work".
What is standard consistency of a cement paste?
It is normal for Ordinary Portland cement to have a consistency ranging from 25-35%. To prepare cement paste of standard consistency, 25-35% of water must be added to cement. For a more detailed explanation, let us assume that a standard consistency is 30%. To make this quantity, add 30% water to 400g of cement.
What are the types of shallow foundation?
How many yards is in a ton of asphalt?
Aproximately 17.78 Sq Yds of asphalt @ 1" thick per ton. Aproximately 17.78 Sq Yds of asphalt @ 1" thick per ton.
TMT means Thermo mechanically treated steel its a new-generation-high-strength steel having superior properties such as weldability, strength, ductility and bendability meeting highest quality standards at international level..thanks Aarif
What is a concrete hollow blocks?
It is a wall constructed from individual small concrete blocks. It may be steel reinforced or not depending on application. They are quick to erect.
Which ASTM standard is equivalent to BS EN 10264-2?
The ASTM equivalent for BS EN 10264-2 is AST A342. These designations are set for steel wires and wire products