answersLogoWhite

0

📱

Industrial Engineering

Industrial Engineering is the branch of engineering that deals with the creation and management of systems that integrate people and materials and energy in productive ways. An industrial engineer studies industrial productivity and makes and implements recommended changes.

2,298 Questions

What is a cog wheel?

A simplistic answer is: A cog wheel is a circular disc that has teeth round the edge. These teeth usually mesh with the teeth of another cog. If one cog is turned, the other cog moves too. The cogs can be made from metal or plastic.

What is the frequency of the secondary of a 230 volt step down transformer?

The frequency is dependant upon what electrical grid that you are connecting the transformerto. If you are connected to a 50 Hz grid, the transformer will output a voltage at 50 Hz. The same thing with the 60 Hz grid, the transformer will output a voltage at 60 Hz.

What is calendering process in plastic?

The calendering process in plastics involves passing polymer materials through a series of heated rollers to create thin sheets or films. This technique allows for precise control over thickness and surface finish, making it suitable for producing a variety of plastic products, including flexible sheets and coatings. The process typically involves melting the polymer, which is then cooled and solidified as it exits the rollers. Calendering is particularly used for materials like PVC and is valued for its efficiency in large-scale production.

What is plasma assisted chemical vapor deposition?

In chemical vapour deposition (CVD) reactants (as vapours) are induced to react or decompose chemically, leaving the desired material as a film on a substrate. The rates of some reactions may be increased in the presence of a plasma adjacent to the substrate. For more information see the wikipedia article about chemical vapour deposition.

How to program on engraving machine gravograph is 6000?

To program the Gravograph IS6000 engraving machine, start by installing the appropriate software, such as Gravostyle. Create or import your design using the software, ensuring it is formatted correctly for the engraving process. Once your design is ready, connect the machine to your computer, select the engraving settings (such as depth and speed), and send the job to the machine for execution. Always consult the user manual for specific instructions and safety precautions.

Does an electrical panel get bonded after a step down transformer?

Yes, both to provide a new neutral-bond connection and to equalize potential between various bonds.

How do you calibrate boiler capacity?

Use a good steam flow meter to know the actual steam flow per hour and use a good pressure indicator to measure the steam pressure. Normally these instruments that are used to measure and calibrate the process parameters are, higher accuracy and pre calibrated with certification, and accredited to authorized national laboratory.

How do you Program an Allen Bradley PLC?

By using a programming terminal / pc/laptop with development software. For a control logix family of AB make PLC, install RSlogix5000 software on a laptop and connect to plc on its suitable port, say Ethernet.

What is the meaning of commissioning of a machine?

Commissioning of a machine - means that a machine is installed, connected and put to its intended use.

However it involves the following :

1. Buying the machine for the purpose, with correct specification

2. getting the machine to the location where it needs to be used.

3. Place the machine exactly in its point of use.

4. Connect the services needed for the machine - it may need suitable electrical connection, suitable water, steam, air, and other pipe lines, etc depending upon the type of machine, use of the machine, purpose of the machine.

5. Once the machine is in place, connected with its service lines as above, you need test the machine for its intended operation. First you test charge the machine, check the connections, dry run with out the product, then after confirming that all its functions look safe, in line with specification and its intended use, you take the real product and try with initial, test speed / slow speed etc. This way you complete the initial checking, test, dry run and product run and then declare that the machine is ready to run for its purpose and hand over the machine to its enduser. You may need need to provide the training also to the end user, operators, technicians, owner to ensure safe, reliable use. Also hand over all the machine related documents to the end user. This process is known as commissioning of the machine.

Why isothermal transformation diagram have C shape?

I think that after heating within the first rang of temperature the crystalline structure dislocation happen and the gaps between the atoms increases more than the solid state. So that it will take time at first to reach this state then after this state is approached the time required to increase the temperature of the metal is less, but after certain time the metal reaches a liquid state. Consequently it will need to evaporate at the next phase so the temperature is settled down on a constant value because this phase needs a huge amount of energy to happen.

I wish that will be beneficial. :D:D

Where do railways tracks source gravel from?

The gravel, usually referred to as ballast, is purchased from quarries.

Which is stronger solid steel or Antimanium?

There is no such thing as antimanium. If you are thinking of the mis-spelling of the material using in X-Men, Wolverine, adamantium, that is science fiction. If you are thinking of antimonium, that is softer than steel.

Why are noise barriers on the sides of highways seemingly always staggered?

So you don't form a resonant chamber, a rectangle, that would cause the noise to be worse. (No, lets be reasonable, shall we?)

Another, more likely, explanation is that you need the ends to overlap, and staggering them is the only logical way to do that. (More rational, actually, don't you think?) Staggering the ends would also strengthen the "box" made up by each unit, so it would not "tip over" in the wind.

How does the Bridge Girder Launcher Construct Bridge?

With the development of our national economy, the construction of high speed railway reaches unprecedented upsurge. For 10 years, ZZHZ has been involved in manufacturing construction machinery and hoisting machinery. Therein, bridge girder launcher and gantry crane are widely used in high speed railway construction, being awarded the national patent. Featuring reasonable design, convenient installation and dismounting, especially high safety, they are highly praised by our customers and make great contribution to safe construction of high speed railway. Construction project of Beijing-Shanghai high speed railway will be one of the biggest projects.

According to design construction specification of Beijing-Shanghai railway and hoisting machinery design specification, ZZHZ designed HZQ series bridge girder launcher for China high speed railway, combined advantages of bridge girder launchers of home and abroad. Made up of main girder, front launching nose, O type support legs, front support legs, bottom launching nose, auxiliary overhead crane, auxiliary support leg of main girder, lifting trolley, winch and lifting system, the bridge girder launcher can install 900t precast girder with span from 24m to 32m.

Steps to construct bridge:

(1). After finishing installation on the abutment, the bridge girder launcher will move longitudinally from one pier to next pier

1. Two lifting trolleys move to the end part of the main girder, then lift auxiliary support legs of main girder, the bridge girder launcher begins to move forward.

2. After front support legs moves to certain position, lift its cylinder and fix the leg

3. Front lifting trolley lifts the end of the bottom launching nose to move forwards about half distance of main girder, auxiliary overhead crane under the front launching nose lifts the bottom launching nose to the front abutment, the longitudinal movement is finished.

(2). Transport girders and Feed girders

1. Two gantry cranes lift one precast girder at the same time

2. The transporter carrys the girder to the end of the bride girder launcher, then take back its cylinder. Trolley to move girders on the transporter carrys the precast girder to somewhere below the front lifting trolley of the bridge girder launcher

3. The front lifting trolley lifts the precast girder to move forwards until the rear lifting trolley can lift the rear part of the precast girder, then they move forwards together

4. Put the girder down into designated location

(3). When the bridge girder launcher installs the last girder,

1. Fold up the bottom part of the front leg, then longitudinally move forwards,

2. Support the support leg, then disassemble the rear support leg of the bottom launching nose and remove the launching nose, put down the last girder to finish constructing the whole bridge.

Why you are giving balance leak offline in multistage pumps?

Balance leakage in multistage pumps is essential to maintain proper hydraulic balance and ensure efficient operation. It helps to equalize pressure between the stages, reducing the risk of cavitation and minimizing wear on the components. By allowing a controlled amount of fluid to leak, it also prevents excessive pressure buildup, which can lead to mechanical failure. Overall, balance leakage enhances reliability and longevity of the pump system.

What is the meaning of 3M?

It used to be:

Minnesota Mining and Manufacturing Company.

How much does pure steel cost?

There are many different types of steel. It would depend on the specifications of the steel.

Does modern technology impact the working environment?

Yes. For example, robots on a production line can operate 24 hrs a day, 7 days a week without tiring or making errors. Thus jobs for humans are being reduced while quality and consistency are kept high.

How do you calculate roof weight of a floating roof storage tank?

Care must be taken in calculating the roof weight of a floating storage tank. The amount of weight per square foot is the most important measurement and must take into account the fluid nature of the whatever is being stored. Checking the ability of the roof to hold the weight is another important fact to not overlook.

Why it is important to inform your supervisor when you leave the work site?

1...So that the supervisor will know that you are not on the work site and does not waste time looking for you...

2..So that the supervisor may assign another person to your job if necessary.

3..So the supervisor knows the reason why you are leaving the work site,in some companies leaving a job/work site without notifying the supervisor can be view as a voluntary quit and you may not have a job when you return...

How many types of load cell?

I think there are 4 types of load cells they are Pancake Load CellS ,Beam Load CellLoad, ButtonSingle and Point Load Cell.